How do you presume the main reasons for India’s power capacity addition falling to a two-decade low?

By May 13, 2019 4:27 pm IST

How do you presume the main reasons for India’s power capacity addition falling to a two-decade low?
.


Mridul Chadha, Senior Analyst & Market Advisor, Climate Connect Technologies

There has been limited industrial growth, due to shifts towards a more services-based economy. This is in some respects an expected part of India’s economic development cycle, but it has reduced peak power demand. So, current installed capacity already gives significant oversupply. It is worth noting that the capacity mix has been changing, with large hydro and thermal having declined and solar and wind showing good growth.

Another significant event which contributed to this decline in capacity growth was mass demonetisation. Non-performance of assets in the power sector was indirectly exacerbated, with several plants owners having to shut down assets, rather than replace them.

Advertising

EPR Android App Banner


Sabyasachi Majumdar, Senior Vice President & Group Head – Corporate Ratings, ICRA

As per ICRA’s study of thermal power assets commissioned in recent years, the average escalation in project cost is about 35-40 per cent of the appraised cost caused mainly by delays in execution and impact of rupee depreciation on cost of imported equipment. Some of these stressed assets are yet to be operational and require resolution of issues related to PPAs and significant funding to achieve commissioning.

While the slowdown in thermal capacity addition was partly compensated by growth in the capacity addition from the renewable segment (RE) in FY2017 and FY2018, the RE segment also witnessed a slowdown in FY2019 owing to issues such as uncertainty over GST rates and safeguard duty for solar power projects and delays in implementation for wind power projects caused by challenges related to land acquisition and transmission connectivity. Nonetheless, the capacity addition is expected to improve in FY2020 on the back of a large number of projects awarded by the Solar Energy Corporation of India (SECI) and state utilities in the wind and solar power segments. The capacity addition from the thermal segment is likely to remain subdued in the near term and would be mainly driven by the central and the state sector utilities. Moreover, the net capacity addition in the thermal segment is expected to be lower owing to de-commissioning of older units as seen over the past two years.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
World Utilities Congress
World Utilities Congress
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Wika
Wika
Ramelex
Ramelex
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Akansha
Akansha
Andritz Hydro Pvt Ltd
Andritz Hydro Pvt Ltd
Vyoma Switchgear
Vyoma Switchgear
Skipper Limited
Skipper Limited
Joint Well
Joint Well
Kp Group
Kp Group
Credence Solar
Credence Solar
Grew Solar
Grew Solar
Nirmal
Nirmal
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Novasys
Novasys
HPL Electric Power
HPL Electric Power
Sun Bond
Sun Bond
Supremesolar
Supremesolar
Vsole Solar
Vsole Solar
Elev8 Lift
Elev8 Lift
Power trac Group
Power trac Group
Omicron
Omicron
Ganz Electric
Ganz Electric
Eplan
Eplan
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
A-1 ELECTRICALS
A-1 ELECTRICALS
Ashone Technologies
Ashone Technologies
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Motwane Manufacturing
Motwane Manufacturing
Sun Cables
Sun Cables