Megger
Megger
Testo
Testo
Rayzon
Rayzon
Home » News » Solar capacity addition likely to lag 15% in FY2021: ICRA

Solar capacity addition likely to lag 15% in FY2021: ICRA

By July 7, 2020 6:05 pm IST

Solar capacity addition likely to lag 15% in FY2021: ICRA
.

The solar capacity addition in FY2019-20 has remained lower by about 15% than ICRA’s previous estimate (7-7.5 GW), mainly on account of the disruption in supply chain and execution disruption in Q4 FY2020 due to the Covid-19 pandemic.

Advertising

EPR Android App Banner

Girishkumar Kadam, Sector Head & Vice President, ICRA Ltd adds, “The backlog of the awarded project pipeline continues to remain strong with more than 15 GW of aggregate project capacity, thus providing a healthy visibility on capacity addition over the next 2-year period.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
Nirmal Wires
Nirmal Wires
Android App
Android App

Events

Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
World Utilities Congress
World Utilities Congress
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Harting
Harting
Doble Engineering
Doble Engineering
CSE Power
CSE Power
Nirmal
Nirmal
Ravin Group
Ravin Group
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Neo Tele Tronixl Pvt Ltd
Neo Tele Tronixl Pvt Ltd
ZIEHL ABEGG
ZIEHL ABEGG
Power Electronical
Power Electronical
Deep Sea Electronics
Deep Sea Electronics
Supremesolar
Supremesolar
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Powerica LTD
Powerica LTD
Eaton
Eaton
AEEPL
AEEPL
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA