Ganz Electric
Ganz Electric
EPR Subscription Banner
EPR Subscription Banner
Promonique Banner
Promonique Banner
Home » INDUSTRY REPORT » The background – BASEC’s position on CE/UKCA marking

The background – BASEC’s position on CE/UKCA marking

By October 3, 2020 1:42 pm IST

The background – BASEC’s position on CE/UKCA marking
.

On 1st September, Ministry of Housing, Communities and Local Government (MHCLG) in the UK communicated the latest position regarding withdrawal from the European Union (EU) and the future position regarding CE marking under construction’s products regulation (CPR). Statutory Instrument 2019 No 465 covers all aspects of how those trading with the UK must move forward with construction products building market standards.

BASEC is in the unique position of having established both BASEC UK as a UKCA approval body NB 2661 and BASEC Conformity Limited (BCL) as an EU27 notified body via NB 2851.

Moving forward
On 1st January 2021, BASEC UK will cease to be an EU27 notified body and automatically gain status as a UK approved body. This will be reflected in a database for UK approved bodies similar to NANDO (yet to be published). The current intention is that the same notified body (NB) number will remain, so BASEC will be UK approved body with the existing NB 2661 number.
It has been confirmed that the UK approval scheme will be a mirror of the current CPR, all EN standards will become UK designated standards and will again be identical to the EN’s. In this way, the AVCP (testing and FPC) will be no different.

As a part of the move away from CE marking to UKCA, the government has allowed a 1-year transition period. Where until 1st January 2022, it will be permissible to use CE marked product that fulfils the below criteria and are:
• Covered by a harmonised European standard, which is the same as a UK designated standard (as noted above)
• Affixed with CE marking
• Accompanied by a manufacturer’s declaration of performance, and
• Have been assessed by an EU-recognised notified body, where third party assessment is required.

The action industry must take
On the surface it appears that there is a further year before definitive action must be taken, however, the below statement brings into focus some urgency, in respect to how transfer of certification between NB’s will need to happen:
“Where a UK notified body (which becomes a UK approved body) had carried out tasks or issued certification in relation to the Assessment and Verification of Performance (AVCP) for a product before 1st January 2021, then those tasks and/or that certification may be used to support affixing of the UK marking if the product is placed on the GB market after this date”

Advertising

EPR Android App Banner

In summary
Key takeaways for you to assess your next steps include:
• As of January 1st, 2021, BASEC will become a UK approved body and no longer an EU27 NB
• BASEC Conformity Limited (BCL) NB 2851 will offer System 1+ CPR AVCP as an EU27 notified body
• BASEC UK will offer UKCA System 1+ and System 3
• There is a 12-month transition period where CE marked product will still be allowed into the UK
• All work carried out by BASEC prior to 31st December 2020 is allowed to be used as technical information to validate UKCA marking This will include any transfers prior to 31st December 2020
• Post 1st January 2021 all UKCA work will require new testing/auditing
• Post 1st January 2021, BASEC/BCL’s service offering will allow 1 set of auditing/testing to satisfy both UKCA (System 1+ and System 3) and CE (System 1+ only) marking obligations.

Here’s what manufacturers should know about the new UK Conformity Assessed (UKCA) marking and CPR fire testing, as exiting the European Union trade deals continue to conclusion.

For any further information,
harpreet.suree@basec.org.uk

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Android App
Android App
EPR eMagazine January 2025
EPR eMagazine January 2025
EPR eMagazine January 2025

Events

India Smart Utility Week
India Smart Utility Week
India Energy Week
India Energy Week
RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Wika
Wika
Greenfinity Powertech Pvt Ltd
Greenfinity Powertech Pvt Ltd
Ramelex
Ramelex
Ambionics India
Ambionics India
Vasundhara Earthing
Vasundhara Earthing
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
NBC Bearings
NBC Bearings
Harting
Harting
CyanConnode
CyanConnode
Hitachi Energy
Hitachi Energy
Doble Engineering
Doble Engineering
CSE Power
CSE Power
ACD Machine Control
ACD Machine Control
Adani Solar
Adani Solar
Kusam Meco
Kusam Meco
Nirmal
Nirmal
Apar Industries
Apar Industries
Aramco Asia
Aramco Asia
Axis Electrical
Axis Electrical
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Neo Tele Tronixl Pvt Ltd
Neo Tele Tronixl Pvt Ltd
ZIEHL ABEGG
ZIEHL ABEGG
Novasys
Novasys
Paras Wires
Paras Wires
Waa Cables
Waa Cables
Balaji Switchgears
Balaji Switchgears
AEW
AEW
Gloster Cables Limited
Gloster Cables Limited
Cabex India
Cabex India
K-Lite Industries
K-Lite Industries
Clariant India
Clariant India
Sun Bond
Sun Bond
Newtech Switchgear
Newtech Switchgear
Supremesolar
Supremesolar
Vsole Solar
Vsole Solar
Ai Earthing
Ai Earthing
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Omicron
Omicron
Dhash
Dhash
CAT
CAT
ATS Group
ATS Group
Ganz Electric
Ganz Electric
Havells
Havells
Eplan
Eplan
Synergy Transformers
Synergy Transformers
Marosons Electricals
Marosons Electricals