Promonique
Promonique
EPR Subscription Banner
EPR Subscription Banner
Promonique Banner
Promonique Banner
Home » News » ₹17 lakh crores investments made in power sector in last nine years: RK Singh

₹17 lakh crores investments made in power sector in last nine years: RK Singh

By EPR Magazine Editorial January 20, 2024 3:22 pm

₹17 lakh crores investments made in power sector in last nine years: RK Singh
.

“Peak electricity demand is likely to cross 400 GW by 2030, we are adding power capacity to meet the burgeoning demand.”

The Union Minister for Power and New and Renewable Energy RK Singh informed that the total investments made in the power sector in the last nine years is about 17 lakh crores, and the capacity under construction is worth investment of a further 17.5 lakh crores. He said, “We have about 99 GW of renewable energy capacity under construction and around 32 GW of renewables under the bidding stage. We shall be bidding around 40 – 50 GW of renewable capacity every year. In thermal capacity, we have about 27 GW under construction, we have bid out an additional 12 GW, 21 GW more under survey and investigation and a further 22 GW under initial stages. We have 47 GW of hydro capacity installed, 18 GW under construction and 13 GW under various stages of survey and investigation.”

The Union Minister said that electricity is the most important infrastructure which is a sine qua non for development, observing that the one major distinguishing feature between a developing and a developed country is that in a developed country, there is no load shedding. “No country can develop if it does not have sufficient power. The power shortage in India has come down from around 4.5 perccent in 2014 to less than 1 percent today. We have ensured universal electricity access, connecting 29 million homes in 19 months, which the International Energy Agency called the largest and fastest expansion of energy access in the history of the power sector,” said Minister RK Singh in an event in New Delhi recently.

Singh laid down the details of the power capacity addition and strengthening of the electricity distribution system. “We added about 194 GW of power capacity, out of which around 107 GW is renewables. We constructed 193,0000 circuit km of transmission lines, which connected the whole country into one grid on one frequency, making it the largest integrated grid in the world. We increased the power transfer capacity from 36 GW to 117 GW today. We added 3,000 substations, upgraded 4000 substations, added about 5.5 lakh circuit km. of LT lines, 2.5 lakh circuit km. of HT lines, about 7.5 lakh transformers and sundry other equipment,” he added.

The Minister further said that as a result of all this, we were able to bring up rural power availability from 12.5 hours in 2015 to around 21 hours today and in urban areas to 23.8 hours. He said , “Days of generators are gone. We have Rules which say that 24*7 power is now a right, no Discom can do gratuitous load shedding if they do that, they will have to pay penalties and consumers will get compensation.”

The Minister observed that India has also emerged as a country which is at the forefront of energy transition. “Our rate of renewable capacity addition has been one of the fastest. We have 187 GW of renewable capacity. We had pledged that we will have 40 percent of our capacity from non-fossil-fuels by 2030, and today, we have 44 percent of our capacity from non-fossil-fuel sources. We have now upped our target and while we have pledged to have 50 percent of our capacity from non-fossil-fuel sources by 2030, we shall have 65 percent of our capacity from non-fossil-sources by 2030,” he added.

The Power and New and Renewable Energy Minister said that the government has transformed the power sector and made it viable. “The AT&C losses have been brought down from 27 percent to 15.41 percent, we want to bring it down further to 10 percent – 11 percent. We are making Rules and ensuring that people follow them. Anybody who violates them will be prosecuted.”

Advertising

EPR Android App Banner

Speaking about the rising power demand, the Minister informed that in 2014, the peak demand was around 130 GW while today it is in the region of 243 GW. “By 2030, the peak electricity demand is likely to cross 400 GW, indicating the fast growth of the economy. The demand grew at 9 percent last year and is growing at 10 percent this year. On a daily basis, the demand is 8 GW – 10 GW more than the same day previous year. There is no other market as big and growing as fast as us.”

Singh said that the nation will add enough capacity to meet this burgeoning demand. “We will cross 500 GW of renewable capacity by 2030. We already have 7 million tonnes of green hydrogen manufacturing lined up.”

He pointed out that India is the most competitive in renewable energy since the cost of renewable energy is the cheapest in the world, despite subsidies and protectionist measures being adopted by some countries. “We are adding energy storage capacity too. We have about 35 GW of Pumped Storage Projects capacity lined up. We are constructing battery storage capacity as well, though it is expensive at present. Unless we have volumes, the price will not come down.”

The Minister said that the government is coming out with a Production Linked Incentive Scheme for grid-scale storage which will further bring down the price of storage. “Due to interventions such as custom duties on solar modules and cells as well as Approved List of Models and Manufacturers, the net result has been that the capacity of module manufacturing has gone up from about 20 GW to about 50 GW now; by 2030, we will have about 24 GW of polysilicon to module manufacturing capacity.”

The Minister said that while we are a leader in manufacturing of wind power equipment, there is a need to domestically manufacture wind turbines of larger capacity. “I have told manufacturers that there will come a time when I am going to say that I will not accept any turbine of less than, let us say 5 MW.” He added that he wants entrepreneurs to enter the field of HVDC Transmission lines. “The manufacturing capacity of thermal equipment such as boilers and steam turbines has come down, since the world thought that India is moving away from thermal capacity addition since the nation is adding so much of capacity.” Singh said that this capacity needs to be augmented.

The Minister said that India is leading the change, being the only country which has achieved both NDCs, though our per capita emissions are one third of global average. “We achieved our commitment to reduce emissions intensity by 2019, 11 years ahead of the target year of 2030. Our energy-saving programmes are world-leading; our Perform Achieve Trade scheme has resulted in reduction of carbon emissions of 107 million tonnes per annum, our LED programme by 113 million tonnes per annum, and STAR rating programme by 57 million tonnes per annum. We have a programme of energy efficiency for the construction sector as well, thus covering the entire gamut of emissions reduction.”

The Minister explained that the government has made Rules and regulations totally business-friendly, through regulations such as General Network Access. “Allotment of connectivity will be done straight away and once you get connected at one point, you get connected to the whole country. You can generate power anywhere and buy and sell anywhere. Further, you do not need a transmission licence to get connected. We have also introduced Green Energy Open Access Rules, which guarantee that you can buy energy from anyone you want.”

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: Power sector
Android App
Android App
EPR EMagazine November 2024
eMagazine November 2024
eMagazine November 2024

Events

Auto EV India
Auto EV India
Global Sustainability Expo & Conference
Global Sustainability Expo & Conference
Elecxpo
Elecxpo
India Smart Utility Week
India Smart Utility Week
RenewX
RenewX

Our Sponsors

CPRI
CPRI
Wika
Wika
Mahindra Powerol
Mahindra Powerol
NangalaWala
NangalaWala
Ramelex
Ramelex
Ambionics India
Ambionics India
Vasundhara Earthing
Vasundhara Earthing
Voltaredox
Voltaredox
Jayashree
Jayashree
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Akansha
Akansha
NBC Bearings
NBC Bearings
Harting
Harting
Doble Engineering
Doble Engineering
Kusam Meco
Kusam Meco
Nirmal
Nirmal
Apar Industries
Apar Industries
Aramco Asia
Aramco Asia
Fluke
Fluke
Emka India Panel Accessories
Emka India Panel Accessories
KEI Industries Limited
KEI Industries Limited
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Godrej Boyce
Godrej Boyce
Icon Solar-En Power
Icon Solar-En Power
ZIEHL ABEGG
ZIEHL ABEGG
Novasys
Novasys
Ramanuj Industries
Ramanuj Industries
Testo India
Testo India
Paras Wires
Paras Wires
Dirak India
Dirak India
Fronius India
Fronius India
Gloster Cables Limited
Gloster Cables Limited
K-Lite Industries
K-Lite Industries
Newtech Switchgear
Newtech Switchgear
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Power trac Group
Power trac Group
flir system
flir system
Omicron
Omicron
Dhash
Dhash
CAT
CAT
Electrical Research Development Association
Electrical Research Development Association
Schneider Electric
Schneider Electric
Triveni Turbine ltd
Triveni Turbine ltd
Kirloskar Pumps
Kirloskar Pumps
Polycab
Polycab
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Powerica LTD
Powerica LTD