Promonique
Promonique
TCI
TCI
EPR Subscription Banner
EPR Subscription Banner
Home » News » Govt sanctions pilot projects for the use of Green Hydrogen in steel production

Govt sanctions pilot projects for the use of Green Hydrogen in steel production  

By October 18, 2024 6:51 pm IST

Govt sanctions pilot projects for the use of Green Hydrogen in steel production  
.

Earlier the Ministry of New and Renewable Energy had issued guidelines for the Implementation of FPilot projects in the Steel Sector under the National Green Hydrogen Mission.

As part of the National Green Hydrogen Mission, the Union Government has sanctioned three pilot projects for the use of Hydrogen in steel production. Earlier the Ministry of New and Renewable Energy had issued guidelines for the Implementation of FPilot projects in the Steel Sector under this Mission. The objectives of the scheme were to identify advanced technologies for utilising green hydrogen in steelmaking, through pilot projects. These pilot projects can demonstrate safe and secure operations of green hydrogen-based steel-making processes, validating technical feasibility and performance, and evaluating their economic viability thereby leading to low-carbon iron and steel production. Accordingly, the proposals were invited for three components (i) a Pilot project to produce DRI using 100 percent Hydrogen using a vertical shaft, (ii) the Use of Hydrogen in a Blast Furnace to reduce coal/ coke consumption and (iii) the Injection of Hydrogen in vertical shaft based DRI making unit.

Advertising

EPR Android App Banner

Based on the evaluations of the proposals received, the Ministry of New and Renewable Energy has sanctioned a total of three pilot projects in the steel sector, (a) Matrix Gas and Renewables Ltd (Consortium members: Gensol Engineering Ltd, Indian Institute of Technology Bhubaneswar, Metsol AB, Sweden) with pilot plant capacity 50 ton-per-day (TPD), (b) Simplex Castings Ltd (Consortium member: BSBK Pvt. Ltd., Ten Eight Investment, IIT Bhilai) with pilot plant capacity 40 TPD and  (c) Steel Authority of India Ltd (Ranchi) with plant capacity 3200 TPD. The total financial support made available will be INR 347 Crore from the union government. These pilot projects are likely to be commissioned in the next 3 years, paving the way to the scaleup of such technologies in India.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Android App
Android App
EPR eMagazine December 2024
EPR eMagazine December 2024
EPR eMagazine December 2024

Events

Elecxpo
Elecxpo
India Smart Utility Week
India Smart Utility Week
RenewX
RenewX

Our Sponsors

Amararaja
Amararaja
Ambica India
Ambica India
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
NBC Bearings
NBC Bearings
Nirmal
Nirmal
Aramco Asia
Aramco Asia
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Lucy Electric
Lucy Electric
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Omicron
Omicron
Polycab
Polycab
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Automatic Electric Ltd
Automatic Electric Ltd