Promonique
Promonique
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » MNRE issues simplified guidelines for rooftop solar installation

MNRE issues simplified guidelines for rooftop solar installation

By February 5, 2022 2:47 pm IST

MNRE issues simplified guidelines for rooftop solar installation
.

The Ministry of New and Renewable Energy has issued simplified procedure for the residential  consumers  to get the rooftop solar plant installed by themselves or through any vendor of their choice under the Rooftop Solar Programme.

The new simplified procedure will be as follows:

A national portal for registering applications from the beneficiary, approval thereof and tracking progress will be developed. There will be a portal in the similar format at the level of the DISCOMs and both the portal will be linked. The household beneficiary, who wishes to install Rooftop Solar (RTS) under the new mechanism will apply on the national portal. The beneficiary will be required to submit necessary information including details of bank account where the subsidy amount will be transferred. At the time of application, the beneficiary will be informed about the complete process and subsidy amount that can be availed for installation of the RTS plant. The application will be forwarded online to the concerned DISCOM for issuance of technical feasibility approval within next 15 working days. After the application is transferred to the DISCOM it will also be displayed on the DISCOM portal. After obtaining technical feasibility, the beneficiary will install the RTS plant from any vendor of his choice by selecting solar modules fulfilling the conditions of DCR and enlistment under ALMM and inverters which are certified by J3IS. The list of empaneled vendors will be provided on the portal.

In order to ensure quality and post installation services, MNRE will issue standards and specifications for RTS plant and a format of agreement to be executed between beneficiary and the vendor. The agreement among other terms and conditions will have the provision to ensure that the RTS plant installed meets safety and performance standards and that the vendor would maintain the plant for next 5 years or higher period as per terms of the agreement.

Advertising

EPR Android App Banner

www.mnre.gov.in or on SPIN portal www.solarrooftop.gov.in.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: MNRENews
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Our Sponsors

Wika
Wika
Ramelex
Ramelex
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Akansha
Akansha
Andritz Hydro Pvt Ltd
Andritz Hydro Pvt Ltd
Vyoma Switchgear
Vyoma Switchgear
Skipper Limited
Skipper Limited
Joint Well
Joint Well
Kp Group
Kp Group
Credence Solar
Credence Solar
Grew Solar
Grew Solar
Nirmal
Nirmal
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Novasys
Novasys
HPL Electric Power
HPL Electric Power
Sun Bond
Sun Bond
Supremesolar
Supremesolar
Vsole Solar
Vsole Solar
Elev8 Lift
Elev8 Lift
Power trac Group
Power trac Group
Omicron
Omicron
Ganz Electric
Ganz Electric
Eplan
Eplan
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
A-1 ELECTRICALS
A-1 ELECTRICALS
Ashone Technologies
Ashone Technologies
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Motwane Manufacturing
Motwane Manufacturing
Sun Cables
Sun Cables