Ganz Electric
Ganz Electric
TCI
TCI
Rayzon
Rayzon
Home » News » Prime Minister to dedicate Stage-I of NTPC’s Lara thermal power station to nation

Prime Minister to dedicate Stage-I of NTPC’s Lara thermal power station to nation

By February 23, 2024 5:48 pm IST

Prime Minister to dedicate Stage-I of NTPC’s Lara thermal power station to nation
.

Located in Raigarh district of Chhattisgarh, coal for this pit-head power station will be supplied from NTPC’s Talaipalli Coal block through Merry-Go-Round (MGR) system.

The Prime Minister Narendra Modi will dedicate Stage-I (2×800 MW) of NTPC’s Lara Super Thermal Power Station and lay foundation stone of Stage-II (2×800 MW) of NTPC’s Lara Super Thermal Power Project through video-conferencing tomorrow.

While Stage-I of the station is built with an investment of approximately Rs 15,800 crore, the Stage-II of the project shall be constructed on the available land of Stage-I, thus requiring no additional land for the expansion, and entails an investment of Rs 15,530 crore.

Located in Raigarh district of Chhattisgarh, coal for this pit-head power station/project will be supplied from NTPC’s Talaipalli Coal block through Merry-Go-Round (MGR) system, ensuring supply of low-cost power with 24×7 availability to the country.

Advertising

EPR Android App Banner

Equipped with highly-efficient Super Critical technology (for Stage-I) and Ultra Super Critical technology (for Stage-II), all the units will ensure lesser Specific Coal Consumption and Carbon-Dioxide emission.

While 50% power from both Stage-I & II is allocated to the state of Chhattisgarh, the project will play a crucial role in improving power scenario in several other states, such as Gujarat, Madhya Pradesh, Maharashtra, Goa, Daman & Diu, Dadra and Nagar Haveli.

Meanwhile, installation of this project is creating direct and indirect employment opportunities in the region. Besides various Community Development initiatives are being taken up by NTPC in the nearby areas in the field of education, drinking water, sanitation, health and women empowerment.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
Webinar
Webinar
Android App
Android App
EPR EMagazine February 2025
EPR eMagazine February 2025
EPR eMagazine February 2025

Events

India Energy Week
India Energy Week
RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Wika
Wika
Ramelex
Ramelex
Ambionics India
Ambionics India
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Harting
Harting
CyanConnode
CyanConnode
Hitachi Energy
Hitachi Energy
Doble Engineering
Doble Engineering
CSE Power
CSE Power
ACD Machine Control
ACD Machine Control
Kusam Meco
Kusam Meco
Nirmal
Nirmal
Apar Industries
Apar Industries
Aramco Asia
Aramco Asia
Axis Electrical
Axis Electrical
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Neo Tele Tronixl Pvt Ltd
Neo Tele Tronixl Pvt Ltd
ZIEHL ABEGG
ZIEHL ABEGG
Paras Wires
Paras Wires
Waa Cables
Waa Cables
Balaji Switchgears
Balaji Switchgears
AEW
AEW
Gloster Cables Limited
Gloster Cables Limited
Cabex India
Cabex India
Newtech Switchgear
Newtech Switchgear
Vsole Solar
Vsole Solar
Ai Earthing
Ai Earthing
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Omicron
Omicron
CAT
CAT
ATS Group
ATS Group
Ganz Electric
Ganz Electric
Havells
Havells
Eplan
Eplan
Synergy Transformers
Synergy Transformers
Marosons Electricals
Marosons Electricals
Myriad Industrial Solutions
Myriad Industrial Solutions
EMR
EMR
Teknika
Teknika
AVR
AVR
Indian Transformers
Indian Transformers
Triveni Turbine ltd
Triveni Turbine ltd
Ultra Electric India
Ultra Electric India
Polycab
Polycab
Electrotherment
Electrotherment
Minilec Group
Minilec Group