Promonique
Promonique
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » Senvion India wins 591 MW order from JSW Energy

Senvion India wins 591 MW order from JSW Energy

By October 4, 2021 2:55 pm IST

Senvion India wins 591 MW order from JSW Energy
.

The fully deployed wind turbines will produce clean energy to supply power to over 450,000 Indian homes.

Senvion, the manufacturer of wind turbines has been awarded a 591 MW project to deliver Wind Turbines for JSW Energy. Senvion turbines will be deployed in JSW Energy’s ongoing pipeline of ~ 2.5 GW of renewable projects which are under construction.

The project will comprise Senvion’s State-of-the-art 2.7MW turbines. When fully deployed these wind turbines will produce enough clean energy to supply the power needs of over 450,000 Indian homes. Key factors in the award of the contract to Senvion included a competitive product due to high-level of indigenisation, technical strength, and quality. The delivery of the turbines will start from H1 of 2022. 

Advertising

EPR Android App Banner

The project also comes with a 10-year Fleet-ProTM O&M contract, which is Senvion comprehensive maintenance program for its installed turbines. Fleet-Pro delivers high-quality digital interface with turbines, on-line prognosis and diagnosis and prompt service to realise full potential of the wind farm.  

Prashant Jain, MD & CEO at JSW Energy said, “We are happy to work with Senvion in our flagship wind projects. Senvion presented a high-quality proposal backed by quality turbines, strong engineering capability and an attitude to jointly work towards solutions for a successful execution of the project. We look forward to on-time completion of the under-construction wind projects.”

“It is a very satisfying win with JSW and Senvion is very thankful for the trust JSW management has put in Senvion’ solutions and team. The success of such project depends on pre-engineering and optimisation which helps not only in winning but in execution later. The two teams are now working relentlessly to meet the commissioning timelines and to build a world-class project. Senvion is fully committed to deliver world-class technology and significantly contribute towards the vision of Indian Government to achieve 450GW of installed renewable power in the country by 2030,” says Amit Kansal, MD & CEO, of Senvion India.

Jamal Wadi, Chairman of Senvion India / President & CEO of Alfanar’s construction and renewable business globally sums it up, “The trust that JSW Energy has placed in Senvion India with the order is a testimony to the superior technology and performance of Senvion India’s wind turbines. Alfanar is committed to strengthen Senvion India to deliver its projects on time with high-quality standards and continuously evolve as the top technology OEM of Wind Technology.”

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
Power Gen
Power Gen
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Wika
Wika
Ramelex
Ramelex
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Akansha
Akansha
Andritz Hydro Pvt Ltd
Andritz Hydro Pvt Ltd
Vyoma Switchgear
Vyoma Switchgear
Skipper Limited
Skipper Limited
Joint Well
Joint Well
Kp Group
Kp Group
Credence Solar
Credence Solar
Grew Solar
Grew Solar
Nirmal
Nirmal
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Novasys
Novasys
HPL Electric Power
HPL Electric Power
Sun Bond
Sun Bond
Supremesolar
Supremesolar
Vsole Solar
Vsole Solar
Elev8 Lift
Elev8 Lift
Power trac Group
Power trac Group
Omicron
Omicron
Ganz Electric
Ganz Electric
Eplan
Eplan
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
A-1 ELECTRICALS
A-1 ELECTRICALS
Ashone Technologies
Ashone Technologies
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Motwane Manufacturing
Motwane Manufacturing
Sun Cables
Sun Cables