Ganz Electric
Ganz Electric
Rayzon
Rayzon
EPR Subscription Banner
EPR Subscription Banner
Home » News » Vertiv announces expansion of its North American manufacturing operations with new facility in Pelzer, South Carolina

Vertiv announces expansion of its North American manufacturing operations with new facility in Pelzer, South Carolina

By October 15, 2024 2:04 pm IST

Vertiv announces expansion of its North American manufacturing operations with new facility in Pelzer, South Carolina
.

The Vertiv Pelzer facility will produce a variety of infrastructure solutions, including integrated modular solutions, modular power systems, and other integrated systems leveraging Vertiv’s portfolio of power, cooling, and IT infrastructure technologies for data centres.

Vertiv a global provider of critical digital infrastructure and continuity solutions, announced a major expansion of its North American manufacturing operations with a new facility in Pelzer, South Carolina. The Vertiv Pelzer facility adds 215,000 square feet (about 20,000 square meters) of manufacturing space and is projected to create up to 300 additional skilled job opportunities at this location. 

The Vertiv Pelzer facility will produce a variety of infrastructure solutions, including integrated modular solutions, modular power systems, and other integrated systems leveraging Vertiv’s portfolio of power, cooling, and IT infrastructure technologies for data centres. These prefabricated and pre-engineered solutions are fully factory pre-tested as a system, significantly reducing site labour requirements and overall data centre time to market. Vertiv integrated modular solutions also provide a path for customers to confidently expand their operations in the future. 

Advertising

EPR Android App Banner

“Our global infrastructure solutions business is strong and growing, as the demand for AI accelerates and our customers see the value of an integrated approach to support faster compute deployment,” said Vertiv CEO Giordano (Gio) Albertazzi. Increasing manufacturing capacity is critical to meeting the needs of our customers, and the Vertiv Pelzer operations are central to that mission for our Americas and global operations.” 

In addition to the new Pelzer facility, Vertiv also has a switchgear and busbar manufacturing facility in nearby Anderson, South Carolina. Vertiv has increased the capacity of its infrastructure solutions, switchgear and busbar businesses through increased utilisation and footprint expansion in the United States, Mexico, Slovakia, United Arab Emirates, Ireland, and Northern Ireland.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Nirmal Wires
Nirmal Wires
Android App
Android App

Events

RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Our Sponsors

Transormer India
Transormer India
Mahindra Powerol
Mahindra Powerol
Transwind Tech
Transwind Tech
Elmeasure
Elmeasure
Apsol
Apsol
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
Akansha
Akansha
Hitachi Energy
Hitachi Energy
Nirmal
Nirmal
Aramco Asia
Aramco Asia
KEI Industries Limited
KEI Industries Limited
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Testo India
Testo India
Rectifiers & Electronics
Rectifiers & Electronics
Elev8 Lift
Elev8 Lift
Ganz Electric
Ganz Electric
Kirloskar Pumps
Kirloskar Pumps
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
Eaton
Eaton
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA