Promonique
Promonique
TCI
TCI
EPR Subscription Banner
EPR Subscription Banner
Home » Power Brand » Learned from the bees – Honeycomb system as a strain relief for cables

Learned from the bees – Honeycomb system as a strain relief for cables

By October 5, 2017 11:50 am IST

Learned from the bees – Honeycomb system as a strain relief for cables
.

igus introduces another world first: Universal strain relief saves engineering and assembly time

Cable tiewraps play a predominant role in strain relief today. Every individual cable is fixed to an e-chain, which is often a job consuming a lot of time and space. Cable tiewraps are used quickly and can often only be used once. The company igus revolutionises the strain relief in the e-chain with the bionically inspired honeycomb system.
This saves the designer’s engineering and assembly time.

The motion plastics specialist igus has now developed a unique strain relief system with a honeycomb structure for its energy supply systems. Cables and hoses can simply and gently be pressed into the honeycomb. It is then closed, whereby the outer walls of the honeycomb cavities are pushed gently but extremely tightly around the cables. In this way, the structure simply adapts to the cable diameters. The honeycomb can be mounted in seconds; in comparison to the often used cable tiewraps or other strain relief solutions, the user saves about 80 percent assembly time. The new system saves space and protects the cables in the e-chain. It is also much more flexible, as the system is easy to open, to insert new cables or to replace them.

Advertising

EPR Android App Banner

New strain relief and separators make the E4.1L the fastest harnessed e-chain
The new honeycomb system is part of an innovation campaign for an even faster and simpler harnessing of e-chains. With the E4.1L, igus offers the most easy-to-fill e-chain on the market. Thanks to the innovative separator system, which was also presented by igus at the 2017 Hannover Messe, a custom interior separation of the energy chain is made still easier for the customer. Furthermore, the new strain relief gives the designer the freedom to insert the cables into the E4.1L precisely as and when he wants it in his own design process – and also the possibility to change this filling again without complication.

For more details, visit www.igus.in

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Android App
Android App
EPR eMagazine December 2024
EPR eMagazine December 2024
EPR eMagazine December 2024

Events

Elecxpo
Elecxpo
India Smart Utility Week
India Smart Utility Week
RenewX
RenewX

Our Sponsors

Amararaja
Amararaja
Ambica India
Ambica India
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
NBC Bearings
NBC Bearings
Nirmal
Nirmal
Aramco Asia
Aramco Asia
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Lucy Electric
Lucy Electric
Elev8 Lift
Elev8 Lift
Synthesis Winding Technologies Pvt Ltd
Synthesis Winding Technologies Pvt Ltd
flir system
flir system
Omicron
Omicron
Polycab
Polycab
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Automatic Electric Ltd
Automatic Electric Ltd