Minutes instead of days: Reduced assembly time of machining centres
By EPR Magazine Editorial January 3, 2019 5:30 pm IST
By EPR Magazine Editorial January 3, 2019 5:30 pm IST
In its robotic machining centres, many companies use fully harnessed energy chain systems from igus. This cuts out many process steps for the manufacturer, reducing assembly time from several weeks to just half a day.
In very few industries, the throughput time is as important as in the machine tool industry. Cutting out individual work steps means achieving considerable savings in process costs. In developing CNC equipment industry, precision and reliability are critical factors. Therefore, it is important to have a reliable means of energy supply from the switch cabinet to the moving parts, which include spindles and motors. At the same time, all the information regarding axis position and dynamics must be passed back to the control system without any interruption. All this happens at accelerations of up to 0.5 g and a maximum travel speed of up to 60 m/min.
Reliable complete solution from a single source
Work steps cut out for significantly greater productivityigus energy chains, including cables and mounting frame, are delivered as fully-assembled readychains. The energy supply systems are then fitted within half a day instead of several weeks. (Source: igus GmbH) Robotic machining systems, energy chains from igus ensure a safe and reliable energy supply. (Source: igus GmbH)
We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.