Ganz Electric
Ganz Electric
TCI
TCI
EPR Subscription Banner
EPR Subscription Banner
Home » Power Update » Mahindra Susten launches India’s first Mobile PV Testing Lab

Mahindra Susten launches India’s first Mobile PV Testing Lab

By October 5, 2017 11:27 am IST

EPR (Electrical & Power Review) | EPR Magazine
.

Mahindra Susten, a solar EPC company, has announced the launch of India’s first mobile PV laboratory for testing of the solar PV modules on site. The mobile PV lab, developed in-house, has an innovative design, which combines all the key tests required for PV modules in a compact lab. This solution will make world-class

testing facilities available to solar asset developers, EPCs and the O&M operators at the location of their own plant.

PV modules account for around 70 per cent of the capex for a solar PV plant, and underperformance of the modules can be the single largest reason why an asset owner’s (lenders) financial model and actual cash flows may not match. Early detection can lead to immediate control of losses or redressal. The role of the PV testing lab is critical across the life cycle of the solar PV plant, right from construction to the end of life.

Speaking about the launch, Basant Jain, CEO, Mahindra Susten, said, “The PV lab will allow the

Advertising

EPR Android App Banner

Pre-construction: Testing the landed delivery of module containers on-site for any damages during manufacturing, transportation or unloading. This could be used to eliminate faulty modules, in addition they can be also used to claim warranty for damaged modules or even transport insurance.

During construction: On-site testing of the connected modules on the Tables to identify any damages during installation or on-field PV module movement. The same can be used to levy LD on the installers and to identify damaged modules early-on.

During O&M: The combination of the on-field IV Curve tracing, Thermography, EL test and the Flash testing, enables conclusive detection of any under-performance of the modules. Hence, allowing for replacement of the degraded modules immediately and at the same time claiming warranty – giving higher returns both in terms of performance as well as spares.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

January Webinar
January Webinar
Android App
Android App
EPR eMagazine January 2025
EPR eMagazine January 2025
EPR eMagazine January 2025

Events

India Smart Utility Week
India Smart Utility Week
India Energy Week
India Energy Week
RenewX
RenewX
Wiretech 2025
Wiretech 2025
India Green Energy Expo
India Green Energy Expo

Our Sponsors

Greenfinity Powertech Pvt Ltd
Greenfinity Powertech Pvt Ltd
Vasundhara Earthing
Vasundhara Earthing
Rayzon Solar Pvt Ltd
Rayzon Solar Pvt Ltd
Om Technical Solutions
Om Technical Solutions
NBC Bearings
NBC Bearings
Harting
Harting
Adani Solar
Adani Solar
Kusam Meco
Kusam Meco
Nirmal
Nirmal
Apar Industries
Apar Industries
Meco Instruments Pvt Ltd
Meco Instruments Pvt Ltd
Novasys
Novasys
AEW
AEW
Cabex India
Cabex India
K-Lite Industries
K-Lite Industries
Clariant India
Clariant India
Sun Bond
Sun Bond
Supremesolar
Supremesolar
Vsole Solar
Vsole Solar
Elev8 Lift
Elev8 Lift
flir system
flir system
Omicron
Omicron
Dhash
Dhash
Kirloskar Pumps
Kirloskar Pumps
Polycab
Polycab
Electrotherment
Electrotherment
Aeron Composite Pvt Ltd
Aeron Composite Pvt Ltd
MENNEKES Electric India
MENNEKES Electric India
PRAMA HIKVISION INDIA
PRAMA HIKVISION INDIA
Automatic Electric Ltd
Automatic Electric Ltd
TDK Electronics
TDK Electronics